ABO Energy GmbH & Co. KGaA es una empresa energética alemana que desarrolla fuentes de energía renovables ( energía eólica y solar , almacenamiento de baterías e hidrógeno ). ABO Energy cuenta con oficinas internacionales en Francia, Finlandia, Polonia, Tanzania, Reino Unido, Irlanda, España, Hungría, Argentina, Canadá, Colombia, Sudáfrica, Túnez y los Países Bajos. En Alemania, ABO Energy opera desde su sede corporativa en Wiesbaden , Hesse , así como en Ingelheim y en oficinas regionales en Berlín , Renania-Palatinado , Baja Sajonia , Renania del Norte-Westfalia , Turingia , Baviera , Mecklemburgo-Pomerania Occidental y Sarre . A partir de 2026, la empresa cuenta con aproximadamente 1200 empleados y trabaja en proyectos que suman más de 34 gigavatios en todo el mundo. [ 1 ]
Historia
1996–2000
Los orígenes de la empresa se remontan a 1996, cuando Jochen Ahn y Matthias Bockholt fundaron «la empresa de planificación para el uso de la energía eólica y otras energías renovables». El primer parque eólico se construyó ese mismo año en Niederlistingen, cerca de Kassel . [ 2 ] En 1998, el primer parque eólico urbano proyectado por la empresa se conectó a la red en Framersheim , Renania-Palatinado. Hasta el año 2000, la empresa planificó y construyó cinco parques eólicos en Hesse y Renania-Palatinado. [ 2 ]
2000–2020
En 2000, los fundadores convirtieron la GmbH en una sociedad anónima y la rebautizaron como ABO Wind. [ 3 ] La primera parte del nombre de la empresa es un acrónimo de los apellidos de los fundadores Ahn y Bockholt.
La filial más antigua en el extranjero es ABO Wind España SAU en Valencia , fundada en 2001. [ 4 ]
Desde 2014, ABO Wind ha solicitado permiso para construir un parque eólico con once turbinas de 150 m de altura en Aughrim, condado de Wicklow , Irlanda. Los residentes locales se opusieron vehementemente al plan y formaron el Grupo de Acción Eólica del Sur de Wicklow (SWWAG) para hacer campaña en su contra. El Consejo del Condado de Wicklow votó en contra del parque eólico [ 5 ]. Volvieron a presentar la solicitud en 2017, la cual también encontró oposición, pero en 2019 An Bord Pleanála aprobó el parque eólico, en contra de la recomendación de su propio inspector, y a partir de 2022 está a la espera de una revisión judicial. [ 6 ]
La empresa comenzó a trabajar en proyectos solares en 2017. [ 2 ]
En 2018, ABO Wind construyó un parque eólico con cinco aerogeneradores Senvion 3.2M122 de 143 metros (469 pies) en antiguas zonas mineras alrededor de la mina a cielo abierto de Jänschwalde , Brandeburgo , en el este de Alemania, muy cerca de la frontera con Polonia. En ese momento se anunció que tenían una cartera de 150 MW compuesta por 66 aerogeneradores terrestres y una planta de biogás . [ 7 ] A principios de 2019, la empresa anunció que cesaba sus operaciones en Irán. [ 8 ]
2020–2024
Los proyectos de almacenamiento de baterías se integraron en el negocio de ABO Wind en 2020. Dos años después, el primer proyecto combinado de energía solar y almacenamiento de baterías se conectó a la red. [ 9 ]
En diciembre de 2022, la filial griega de la empresa completó la instalación del parque solar Margariti de 50 megavatios en la región de Epiro, en el noroeste de Grecia, que entró en funcionamiento en diciembre de 2023. [ 2 ] Se espera que el parque fotovoltaico, que utiliza 93 000 paneles bifaciales y 10 estaciones inversoras centrales, produzca unos 76 GWh de electricidad verde y reduzca aproximadamente 32 000 toneladas de emisiones de CO₂ cada año. [ 10 ]
En enero de 2023 se anunció que ABO Wind combinaría la energía eólica con hidrógeno verde para una estación de repostaje de autobuses y camiones en el parque empresarial Hessisches Kegelspiel en Hünfeld , fruto de más de diez años de desarrollo en el campo de la energía del hidrógeno. El hidrógeno se producirá mediante un electrolizador, en el que la electrólisis del agua se alimenta con una turbina eólica, y se espera que pueda abastecer a 50 camiones al día. [ 11 ]
En febrero de 2023, ABO Energy firmó un acuerdo con Repsol Renovables para cinco proyectos de energías renovables, incluyendo tres parques eólicos con una capacidad total de 150 megavatios y dos proyectos solares con una capacidad total de 100 megavatios en emplazamientos de Palencia , en el norte de España. Una vez finalizados en 2024 y 2025, estos parques suministrarán electricidad a 172.000 hogares de la región. La compañía también opera en la región de Castilla y León , en el norte de España, y entre 2019 y 2022 desarrolló un parque eólico en Valladolid . [ 12 ]
In 2023, the shareholders voted in favour of changing the legal form of the AG to a partnership limited by shares at an extraordinary general meeting. In the course of considering the new legal form, the company also scrutinised its name. The company's new name, ABO Energy, reflects the significant growth in its technological horizons since it was founded in 1996.[13] In July 2024, the company has completed its change of legal structure.
As of 2024, ABO Energy has planned and built energy farms with a total volume of more than 5.5 gigawatts of capacity and has over 1,200 employees.[1] It has connected around 900 wind, solar and battery storage facilities with a nominal capacity of over 2.5 gigawatts to the grid in Germany, France, Finland, Spain, the United Kingdom, Greece, Hungary, Bulgaria, Ireland, Tunisia, Poland, and Iran.[2]
Services
ABO Energy covers all stages of renewable energy project development internationally - planning, financing, construction supervision and organization.[14] As a service, the company offers commercial and technical management for wind farms, solar farms and battery storage as well as maintenance and other services. Customers are buyers of the plants projected by ABO Energy as well as other operators such as Rheinenergie. To improve the security of wind farms and to control access, the company has developed the electronic locking system ABO Lock.[15] Usually with commissioning, ABO Energy sells the plants, for example, to energy suppliers, cooperatives or institutional investors.
Locations
Currently, the company is active on four continents. In Germany, ABO Energy operates at its corporate headquarters in Wiesbaden as well as in Ingelheim and in regional offices in Berlin, Rhineland-Palatinate, Lower Saxony, North Rhine-Westphalia, Thuringia, Bavaria, Mecklenburg-Vorpommern as well as in Saarland. The company has established a global presence with international offices in Finland, France, the UK, Ireland, Poland, Spain, Hungary, Argentina, Canada, Colombia, South Africa, Tunisia, Tanzania, and the Netherlands.[4]
Management board
In 2024, six people made up ABO Energy’s Management Board: Dr. Karsten Schlageter, Dr. Jochen Ahn, Matthias Hollmann, Susanne von Mutius, Alexander Reinicke and Dr. Thomas Treiling.[16] As of 2026, the board is composed of Dr. Karsten Schlageter, Matthias Hollmann, Susanne von Mutius and Dr. Thomas Treiling.[17]
Supervisory board
At the Annual General Meeting in June 2017, the shareholders elected the former Minister of Economics and Energy of Rhineland-Palatinate, Eveline Lemke, to the supervisory board.[18] In 2026, Dr. Alexander Thomas (chairman), Maike Schmidt, Dr. Daniel Duben, Natalie Hahner, Jürgen Koppmann and Moritz Möller form the supervisory board.[19]
References
- 12"Facts & Figures ABO Energy" Website ABO Energy. Retrieved 23 June 2026.
- 12345"References ABO Energy" Website ABO Energy. Retrieved 31 July 2024.
- ↑"ABO Wind 1996 bis 2021". Abo-wind.com (in German). Retrieved 14 February 2023.
- 12"Company ABO Energy" Website ABO Energy. Retrieved 31 July 2024.
- ↑"New application for 11-turbine wind farm in south Wicklow". Irish Independent. 15 July 2017. Retrieved 1 March 2023.
- ↑"Row over planned wind farm at Cork beauty spot Gougane Barra". The Irish Times. 26 April 2022. Retrieved 1 March 2023.
- ↑"ABO starts German foundation course" (in German). renews.biz. 29 August 2018. Retrieved 1 March 2023.
- ↑"ABO Wind AG". renewable-energy-industry.com. Retrieved 1 March 2023.
- ↑"Battery and Hybrid Energy Systems" Website ABO Energy. Retrieved 31 July 2024.
- ↑"ABO Wind completes construction of 50 MW solar farm in Greece". Yahoo News. 21 December 2022. Retrieved 1 March 2023.
- ↑"ABO Wind to combine wind power with green hydrogen for refueling station". Hydrogen Fuel News. 19 January 2023. Retrieved 1 March 2023.
- ↑ "ABO Wind vende 250 MW de proyectos de energía renovable a Repsol" . Revista de Energía Renovable. 28 de febrero de 2023. Consultado el 1 de marzo de 2023 .
- ↑ "ABO Wind ahora es ABO Energy" . Aboenergy.com . Consultado el 29 de julio de 2024 .
- ↑ "Unternehmen" . Abo-wind.com (en alemán) . Consultado el 1 de marzo de 2023 .
- ↑ "Schluss mit unbefugtem Zutritt" . Industry.com (en alemán). 10 de septiembre de 2018 . Consultado el 1 de marzo de 2023 .
- ↑ Sitio web del "Consejo de Administración" de ABO Energy. Consultado el 31 de julio de 2024.
- ↑ Sitio web del "Consejo de Administración" de ABO Energy. Consultado el 23 de junio de 2026.
- ↑ "Für Windkraft-Unternehmen tätig: Ex-Energieministerin Lemke wird Mitglied im Aufsichtsrat" . Rhein-zeitung.de (en alemán). 21 de julio de 2017 . Consultado el 14 de febrero de 2023 .
- ↑ Sitio web del "Consejo de Supervisión" de ABO Energy. Consultado el 23 de junio de 2026.
Enlaces externos
- Sitio web oficial
- Financial Times
- Empresas alemanas de energías renovables
- Empresas fundadas en 1996
- Empresas con sede en Wiesbaden
- Empresas de energía eólica de Alemania