En esta página se presenta una lista de los túneles de carretera más largos del mundo. En esta página se enumeran todos los túneles de carretera de más de 5 km (3 mi).
Los túneles de carretera más largos del mundo en uso
Bajo construcción
Timeline of world record lengths
See also
Notes
- ^ 17.540 km + 17.485 km
- ^ left tube 13,833 m, right tube 13,792 m
- ^ Left tube 13,654 m; Right tube13,570 m
- ^ left tube 13,433 m, right tube 13,381 m
- ^ left tube 13,122 m, right tube: 13,098 m
- ^ Tunnel section of KPE (8.13 km) and MCE (4.33 km) are contiguous, hence classified as one tunnel
- ^ Dual carriageway 12 Lanes of traffic (maximum width: 70m) with each direction separated only by a full-height wall, thus considered to be one tube
- ^ 12.290 km + 12.286 km
- ^ left tube: 11,764m, right tube: 11,775m
- ^ Left tube: 11,475m, Right tube: 11,520m, 1266m deep
- ^ Left tube: 11,489m, Right tube: 11,456m
- ^ left tube 11,408 m, right tube: 11,377 m
- ^ segments 7.5 km (4.7 mi), 2.2 km (1.4 mi) and 1.7 km (1.1 mi)
- ^ forked with roundabout and 3 segments
- ^ left tube 11,200m, right tube 11,195 m
- ^ the older tube 10,926 m
- ^ second tube opened in 1991
- ^ 10.965 km (Seoul bound, 10.962 km (Yangyang Bound)
- ^ left tube: 10,497m, right tube: 10,485m
- ^ left tube: 10,497m, right tube: 10,485m
- ^ left tube 10,192 m, right tube 10,480 m
- ^ the newer tube 10,173 m)
- ^ second tube opened in 1995
- ^ the older tube 9,755 m, the newer tube 10,085 m)
- ^ second tube opened in 2004
- ^ previous name is Daxiangling Tunnel
- ^ 10.007 km + 9.962 km
- ^ the two two-lane directions are superimposed (hence duplex) in one tube
- ^ longest underground branch: W-E direction tube (Avenida de Portugal, M-30, Bypass sur)
- ^ left tube: 9,753m, right tube: 9,752m
- ^ left tube 9,670 m, right tube 9,663 m
- ^ left tube: 9,585m, right tube: 9,651m
- ^ two subsea tubes (second 9,583 m)
- ^ left tube 9,490 m, right tube 9,480 m
- ^ left tube 9,252 m, right tube 9,198 m
- ^ left tube: 9,228m, right tube: 9,215m
- ^ 3 branches connecting in a Y-junction inside the tunnel
- ^ previous name is Mayazi Tunnel
- ^ left tube 8,985 m, right tube 9,007 m
- ^ left tube 8,803 m, right tube 8,805 m
- ^ left tube 8,803 m, right tube 8,776 m
- ^ left tube 8,694 m, right tube 8,688 m
- ^ previous name is Longtan Tunnel
- ^ 8.693 km + 8.599 km
- ^ Left tube: 8,640m, Right tube: 8,776m
- ^ left tube 8,668 m, right tube 8,631 m
- ^ second tube opened in 1985
- ^ left tube 8,511 m, right tube 8,477 m
- ^ The longer of two segments separated by half a kilometre, the other one being 1.9 km (1.2 mi); total length 10.4 kilometres (6.5 mi).
- ^ left tube: 8,360m, right tube: 8,305m
- ^ left tube 8,263 m, right tube 8,242 m
- ^ left tube 8,262m, right tube 8,247m
- ^ previous name is Mixiliang Tunnel
- ^ Left tube: 7,930m, Right tube: 7,871m
- ^ left tube 7,886 m, right tube 7,892 m
- ^ Left tube: 7,654m, Right tube: 7,670m
- ^ 7.605 km + 7.567 km
- ^ 7.605 km + 7.536 km
- ^ left tube 7,597m, right tube 7,560m
- ^ left tube 7,548 m, right tube 7,531 m
- ^ 7.540 km (Busan bound), 7.543 km (Pohang Bound)
- ^ left tube: 7,525m, right tube: 7,527m
- ^ left tube 7,524 m, right tube 7,493 m
- ^ 7.353 km + 7.280 km
- ^ left tube 7,246 m, right tube 7,223 m
- ^ 7.190 km (Gijang bound), 7.087 km (Jinyeong Bound)
- ^ left tube: 7,066m, right tube: 7,032m
- ^ in 1976 opened as road tunnel, in 1937 originally opened as rail tunnel
- ^ left tube 6,848 m, right tube 6,868 m
- ^ left tube 6,810 m, right tube 6,806 m
- ^ left tube 6,795 m, right tube 6,785 m
- ^ left tube 6,752 m, right tube 6,776 m
- ^ previous name is Xizhouling Tunnel
- ^ left tube 6,750 m, right tube 6,765 m
- ^ 6.708 km + 6.693 km
- ^ left tube: 6,685m, right tube: 6,640m
- ^ 6.678 km + 6.676 km
- ^ 6.656 km + 6.676 km
- ^ 6.664 km + 6.663 km
- ^ left tube: 6,618m, right tube: 6,592m
- ^ left tube 6,515 m, right tube 6,570 m
- ^ 6.557 km + 6.555 km
- ^ both tubes 6.555 km
- ^ left tube 6,521 m, right tube 6,551 m
- ^ left tube: 6,521m, right tube: 6,537m
- ^ left tube 6,410 m, right tube 6,440 m
- ^ Left tube: 6,420m, Right tube: 6,380m
- ^ the newer tube 6,392 m
- ^ left tube 6,395 m, right tube 6,400 m
- ^ left tube: 6,336m, right tube: 6,350m
- ^ the newer tube 6,328 m
- ^ left tube 6,314 m, right tube 6,333 m
- ^ left tube: 6,284m, right tube: 6,328m
- ^ left tube 6,318 m, right tube 6,307 m
- ^ left tube 6,308 m, right tube 6,280 m
- ^ left tube 6,201 m, right tube 6,254 m
- ^ left tube 6,142 m, right tube 6,187 m
- ^ left tube: 6,185m, right tube: 6,130m
- ^ left tube 6,125 m, right tube 6,145 m
- ^ left tube 6,102 m, right tube 6,144 m
- ^ 6.123 km + 6.115 km
- ^ 6.105 km + 6.082 km
- ^ left tube 6,015 m, right tube 6,058 m
- ^ left tube 6,051 m, right tube 6,043 m
- ^ left tube: 5,946.5m, right tube: 6,043.42m
- ^ left tube: 6,010m, right tube: 6,020m
- ^ left tube: 6,010m, right tube: 6,020m
- ^ left tube: 5,910m, right tube: 6,010m
- ^ left tube: 5,973m, right tube: 5,997m
- ^ left tube 5,972 m, right tube 5,963 m
- ^ left tube 5,874 m, right tube 5,898 m
- ^ left tube 5,897 m, right tube 5,773.5 m
- ^ left tube 5,850 m, right tube 5,837 m
- ^ left tube 5,685 m, right tube 5,833 m
- ^ left tube: 5804m right tube:5805m
- ^ a b A subaqueous tunnel
- ^ subsea
- ^ left tube: 5754m right tube:5726m
- ^ left tube: 5,727m, right tube: 5,720m; elevation: 4,750m
- ^ left tube: 5,715m, right tube: 5,670m
- ^ left tube: 5,715m, right tube: 5,670m
- ^ left tube: 5,653m, right tube: 5,681m
- ^ left tube: 5,656m, right tube: 5,677.3m
- ^ left tube: 5,635m, right tube: 5,645m
- ^ left tube: 5,627m, right tube: 5,628m
- ^ left tube: 5,627m, right tube: 5,628m
- ^ left tube: 5,568m, right tube: 5,580m
- ^ left tube: 5,565m, right tube: 5,575m
- ^ left tube: 5,535m, right tube: 5,520m
- ^ left tube: 5,518m, right tube: 5,521m
- ^ left tube: 5,518m, right tube: 5,510m
- ^ left tube: 5,512m, right tube: 5,512m
- ^ left tube: 5,450m, right tube: 5,510m
- ^ left tube: 5,444m, right tube: 5,501m
- ^ left tube: 5,412m, right tube: 5,493m
- ^ left tube: 5,461m, right tube: 5,476m
- ^ left tube: 5445m right tube:5450m
- ^ left tube: 5431m right tube:5434m
- ^ left tube: 5,408m, right tube: 5,385m
- ^ left tube: 5,351m, right tube: 5,367m
- ^ left tube: 5,347m, right tube: 5,264m
- ^ left tube: 5,263m, right tube: 5,338m
- ^ left tube: 5,273m, right tube: 5,333m
- ^ left tube: 5,305m, right tube: 5,325m
- ^ left tube: 5,215m, right tube: 5,300m
- ^ left tube: 5,265m, right tube: 5,275m
- ^ left tube: 5,270 m, right tube: 5,273 m
- ^ left tube: 5,259m, right tube:5,255m
- ^ left tube: 5,257m, right tube: 5,222m
- ^ left tube: 5,160m, right tube:5,235m
- ^ left tube: 5,107m, right tube: 5,228m
- ^ left tube: 5,190m, right tube:5,225m
- ^ left tube: 5,165m, right tube:5,180m
- ^ left tube: 5,177m, right tube:5,160m
- ^ left tube: 5,067m, right tube:5,143m
- ^ left tube: 5,140m, right tube:5,108m
- ^ left tube: 5,110m, right tube: 5,105m
- ^ left tube: 5,068m, right tube: 5,106m
- ^ left tube: 5085m right tube:5080m
- ^ left tube: 5,053m, right tube: 5,053m
- ^ left tube: 5,028m, right tube: 4,984m
- ^ left tube: 5,000m, right tube: 5,024m
- ^ left tube: 5,018m, right tube: 5,000m
- ^ left tube: 5,014m, right tube: 5,015m
- ^ left tube: 5,012m, right tube:4,998m
- ^ left tube: 4,965m, right tube:5,000m
- ^ left tube: 12,878m, right tube: 12,945m
- ^ tunnel section of NSC are (10.4 km), while sub-surface section is (2.1km)
- ^ left tube: 11,764m, right tube: 11,775m
- ^ Left tube: 10,983m, Right tube: 11,036m
- ^ left tube: 10,990m, right tube: 11,000m
- ^ left tube: 10,990m, right tube: 10,922m
- ^ left tube: 10,990m, right tube: 10,922m
- ^ left tube: 10,297m, right tube: 10,251m
- ^ left tube: 10,235m, right tube: 10,210m
- ^ left tube: 10,127m, right tube: 10,046m
- ^ left tube: 9,857m, right tube: 9,878m
- ^ Left tube: 8,865m, Right tube: 8,780m
- ^ left tube: 8,360m, right tube: 8,355m
- ^ left tube: 8,360m, right tube: 8,305m
- ^ left tube 7,503 m, right tube 7,537 m
- ^ left tube: 6,930m, right tube: 6,887m
- ^ Left tube: 6,772m, Right tube: 6,655m
- ^ left tube: 6,044m, right tube: 5,943m; elevation: 3,500m
- ^ 1 tube + 1 service tube 5,490 m)
- ^ Elevation: >3,300m
References
- ^ "Frequently asked questions | M4 and M8 extensions | WestConnex". westconnexm4m8.com.au. Retrieved 2024-06-10.
- ^ Shougen Chen (2013). "Journal of Modern Transportation: Key technologies for construction of Jinping traffic tunnel with an extremely deep overburden and a high water pressure". Journal of Modern Transportation. 19 (2): 94–103. doi:10.1007/BF03325746.
- ^ 锦屏水电枢纽工程锦屏山隧道 (in Chinese). Archived from the original on October 7, 2013. Retrieved February 17, 2014.
- ^ "隧道工程的"禁区"木寨岭再攻坚-新华网". www.xinhuanet.com. Archived from the original on March 25, 2019. Retrieved 2020-07-06.
- ^ "Başkan Recep Tayyip Erdoğan Yeni Zigana Tüneli'ni hizmete alacak! Türkiye Yüzyılı'na bir eser daha".
- ^ "Son dakika... Ovit Tüneli hizmete girdi". 13 June 2018.
- ^ "巴陕高速米仓山特长隧道开工-四川日报网". Economy.scdaily.cn. Retrieved 2016-02-01.
- ^ "太古高速公路正式通车 西山特长隧道长度为全省第一全国第二". Archived from the original on 22 September 2013. Retrieved 30 September 2014.
- ^ "狮子坪隧道可跑了!今天中午12点,汶马高速通车! - 川观新闻". cbgc.scol.com.cn (in Simplified Chinese). Retrieved 2021-02-07.
- ^ http://www.crcc.cn/g282/s893/t31120.asp [dead link]
- ^ "[山西]长平高速公路正式运营". Archived from the original on 16 December 2013. Retrieved 30 September 2014.
- ^ "西康高速全线贯通 陕西提前两年实现市市通高速 - 新闻频道 - 西部网(陕西新闻网)WWW.CNWEST.COM". News.cnwest.com. 2009-05-28. Archived from the original on 2014-03-16. Retrieved 2016-02-01.
- ^ "Sandoyartunnilin". Faroese Government. Retrieved 21 December 2023.
- ^ "Toven tunnel holing imminent - tunnelbuilder.com News". Tunnelbuilder.com. 2012-01-23. Retrieved 2016-02-01.
- ^ "Wegenwiki: Baotashan Tunnel". Retrieved 30 September 2014.
- ^ "山西省交通运输厅". Archived from the original on 6 October 2014. Retrieved 30 September 2014.
- ^ "雅西高速公路大相岭泥巴山隧道双向贯通-新闻频道-雅安北纬网". Archived from the original on 6 October 2014. Retrieved 30 September 2014.
- ^ "Mælefjelltunnelen er åpnet". 19 December 2019.
- ^ Ashiq, Peerzada (2017-04-02). "Swap terrorism for tourism, Modi tells Kashmiri youth". The Hindu.
- ^ 重庆市政府网站 (2021-01-26). "万开快速通道临时通车". news.sina.com.cn. Retrieved 2021-01-26.
- ^ News, Indian Defence (3 October 2020). "9-km-long Atal Tunnel an engineering marvel". Indian Defense News, Indian Armed Forces, IDRW, Defence. Retrieved 2020-10-04.
{{cite web}}:|last=has generic name (help) - ^ "武都至罐子沟高速公路今日通车 结束陇南境内无高速公路的历史". Archived from the original on 7 January 2014. Retrieved 30 September 2014.
- ^ "上海长江隧桥通车_新浪上海_新浪网". Sh.sina.com.cn. 2009-10-16. Retrieved 2016-02-01.
- ^ "建(个)元高速公路最长隧道——兴隆隧道顺利贯通_经济_云南频道_云南网". yn.yunnan.cn. Retrieved 2022-04-01.
- ^ "Aperta la Variante di valico sull'A1 - Toscana - il Tirreno". 23 December 2015.
- ^ https://www.nytimes.com/reuters/2020/09/04/world/americas/04reuters-colombia-tunnel.html [dead link]
- ^ "Sharif to inaugurate Lowari tunnel today". 2017-07-20.
- ^ "中国最长海底隧道青岛胶州湾海底隧道通车 ——中新网". Chinanews.com. Retrieved 2016-02-01.
- ^ "公路隔离栅工程施工招标公告-四川招标网" (in Chinese). 2005-12-05.
- ^ "渝湘高速最长隧道白云隧道月底贯通_新闻中心_新浪网" (in Chinese). 2008-01-11.
- ^ "错误信息". www.cr20g.com. Archived from the original on March 16, 2014.
- ^ "赣鄂隧道快速施工的关键技术". Retrieved 30 September 2014.
- ^ "超6800米!临清高速公路大亮山特长隧道双幅顺利贯通". m.yunnan.cn. Retrieved 2022-05-21.
- ^ "张涿高速公路张家口段顺利通车" (in Chinese). Archived from the original on 2014-01-07.
- ^ "单洞全长13716米的永古高速安远隧道全线贯通". Archived from the original on 21 June 2013. Retrieved 30 September 2014.
- ^ "人民网". Archived from the original on 16 March 2014. Retrieved 30 September 2014.
- ^ "承(德)赤(峰)高速茅荆坝隧道全线贯通". Archived from the original on May 22, 2013. Retrieved 30 September 2014.
- ^ "武警交通部队参与建设华北最长高速公路隧道通车". Archived from the original on December 28, 2013. Retrieved 30 September 2014.
- ^ 蓝涛 陈莹莹. "云景高速西周岭隧道贯通". Archived from the original on 6 October 2014. Retrieved 30 September 2014.
- ^ "云景高速昨晚八时正式通车--新闻". Archived from the original on 2014-10-06. Retrieved 30 September 2014.
- ^ "国道109新线饮马鞍隧道开挖进尺突破4000米!". j.021east.com. Retrieved 2022-05-22.
- ^ "景文3标项目叶麻尖1#隧道顺利进洞施工". wemp.app. Retrieved 2020-10-11.
- ^ 杜漩. "视频|南两高速今日通车 从南川到两江新区仅需50分钟". cq.cqnews.net. Retrieved 2020-10-20.
- ^ "大丰华高速一期今日正式通车_建设". www.sohu.com. Retrieved 2021-06-29.
- ^ "广西在建高速公路最长隧道——燕来隧道全幅贯通!__中国交通新闻网". www.zgjtb.com. Retrieved 2022-06-18.
- ^ "芒市至梁河高速芒市隧道单洞完成掘进支护621米_经济_云南频道_云南网". yn.yunnan.cn. Retrieved 2022-06-19.
- ^ "芷铜高速4座隧道已实现双洞贯通,年底全线所有隧道实现贯通_腾讯新闻". new.qq.com. Retrieved 2022-06-19.
- ^ "Abre-se o túnel do Marão, quebra-se a "barreira psicológica"" (in Portuguese). Publico newspaper. Retrieved 7 May 2016.
- ^ "广平高速青溪隧道贯通 青川境内13座隧道已全部实现贯通_施工_建设_高速公路". www.sohu.com. Retrieved 2022-06-24.
- ^ 网易 (2022-03-18). "昌保高速昌宁隧道左右线工程完成过半". www.163.com. Retrieved 2022-06-24.
- ^ "Eurasia Tunnel opens, linking Europe and Asia in 15 minutes". Daily Sabah. 20 December 2016.
- ^ "中国水利水电第十四工程局有限公司 基础设施 宜昭高速新场隧道进口左幅进尺突破1000米". 14j.powerchina.cn. Retrieved 2022-06-24.
- ^ "遵秦高速鹁塘沟特长隧道右洞贯通". jtt.hebei.gov.cn. Retrieved 2022-06-24.
- ^ "金鸡湖隧道最新公示!计划2022年底建成通车_中国江苏网". jsnews.jschina.com.cn. Retrieved 2022-06-24.
- ^ "云南临沧安石隧道突泥涌水事故已致6人遇难!1人获救6人仍被困_救援". www.sohu.com. Retrieved 2020-10-12.
- ^ "5334米!发瑞隧道左洞实现贯通 成为广西已贯通的最长公路隧道!(图)". www.chinahighway.com. Retrieved 2022-06-24.
- ^ "鹤庆至剑川至兰坪高速公路施工招标!_路线". www.sohu.com. Retrieved 2020-10-12.
- ^ "新进展!昭泸高速项目两座特长隧道相继顺利贯通,标志着顶拉至花山段全线贯通_中铁十八局". www.sohu.com. Retrieved 2022-06-24.
- ^ 网易 (2018-07-02). "渝黔高速尧龙山隧道正式进洞施工". chongqing.163.com. Retrieved 2022-06-24.
- ^ "Shahriston tunnel expected to be commissioned this month". archive.is. 23 July 2013. Archived from the original on 23 July 2013.
- ^ "索古修寨隧道双线贯通 _ 东方财富网". finance.eastmoney.com. Retrieved 2022-06-24.
- ^ "【关注明日天气】都匀这个镇要通高速了!新隧道已突破千米大关!_施工". www.sohu.com. Retrieved 2020-10-12.
- ^ https://www.epd.gov.hk/eia/register/report/eiareport/eia_1742009/html/Section%203%20Project%20Description/Section%203%20-%20Project%20Description%20-%2021.07.09.htm
- ^ http://www.enpo.com.hk/EMnA_Report/TMCLKL_HY201208/manual/pdf/toc.pdf& [dead link]
- ^ "Highways Department - Tuen Mun – Chek Lap Kok Link (TM-CLKL)".
- ^ "E39 Rogfast - Statens Vegvesen". Vegvesen.no. 2017-05-23. Retrieved 2017-07-07.
- ^ "Statens vegvesen - E39 Rogfast - Nå starter vi! - Statens Vegvesen". Youtube.com. 2017-06-15. Retrieved 2017-07-07.
- ^ https://nforeningen.no/rogfast-til-stortinget-i-desember/
- ^ "22公里!世界最长高速公路隧道复工 -中新网视频". www.chinanews.com. Retrieved 2020-07-06.
- ^ "Tianshan Shengli Tunnel - Wegenwiki". www.wegenwiki.nl. Retrieved 2020-07-06.
- ^ "Tianshan Shengli tunnel under construction in Xinjiang - China News - SINA English".
- ^ "E4 Förbifart Stockholm - Trafikverket". Trafikverket.se. 2015-09-25. Retrieved 2016-02-01.
- ^ "E4 Förbifart Stockholm". 2023.
- ^ "Förlängd byggtid och ökad kostnad för E4 Förbifart Stockholm".
- ^ 经济日报 (2020-03-09). "乐山至西昌高速公路大凉山1号隧道开建". news.sina.com.cn. Retrieved 2020-10-07.
- ^ "Zoji la Tunnel for all-weather Kashmir-Ladakh road; PM Modi to lay foundation stone of big infra project". 16 May 2018.
- ^ "Work On Zojila Pass Tunnel In J&K To Commence On August 15, NHIDCL Says". Bloombergquint.com. 5 June 2017. Retrieved 24 February 2018.
- ^ "中铁交通投资集团黎霍高速项目三分部太岳山隧道进口突破千米". xw.qq.com (in Chinese). Retrieved 2022-06-24.
- ^ "Breakthrough in the spectacular project Eysturoy Tunnel on the Faroe Islands". 10 June 2019.
- ^ "台9線蘇花公路安全提升計畫". Retrieved 2021-11-22.
- ^ Tiempo, Casa Editorial El (25 May 2015). "Así será el Túnel del Toyo: el más largo y costoso que hará el país". El Tiempo.
- ^ "Construction of a new Kvesheti-Kobi road and 9 km long tunnel has been launched". georoad.ge. 2021-06-11. Retrieved 2021-07-17.
- ^ a b c "太原首次,三条特长隧道同步施工!_二环". www.sohu.com. Retrieved 2022-05-01.
- ^ "麟法高速野河山隧道出口顺利进洞_施工". www.sohu.com. Retrieved 2022-05-04.
- ^ "云南福宜高速公路梁王山隧道正洞掘进突破4100米". yn.news.cn. Retrieved 2022-05-07.
- ^ "吕梁石楼县汾石高速东山特长隧道开工". sx.people.com.cn. Retrieved 2022-05-15.
- ^ The Slovak Spectator (2019-03-07). "The current constructor of the Višňové tunnel will not complete it". spectator.sme.sk. Retrieved 2019-08-17.
- ^ 新疆949交通广播 (2022-05-23). "新进展!进洞施工!". k.sina.cn. Retrieved 2022-06-18.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ^ MLIT Hokkaido Regional Development Bureau (2023-01-17). "北海道縦貫自動車道 七飯-大沼 再評価原案準備書説明資料" (PDF). hkd.mlit.go.jp. Retrieved 2023-06-17.
- ^ Oficina de Desarrollo Regional de MLIT Hokkaido (17 de enero de 2023). "北海道縦貫自動車道 七飯-大沼 費用便益分析バックデータ" (PDF) . hkd.mlit.go.jp. Consultado el 17 de junio de 2023 .
- ^ "珙县第一条高速最新进展,上罗隧道横洞正式进洞施工!-看点快报". kuaibao.qq.com . Consultado el 10 de octubre de 2020 .
- ^ "总投资170亿元,中冶交通建设集团联合体中标云南高速项目!_腾讯新闻". nuevo.qq.com . Consultado el 21 de mayo de 2022 .
- ^ "新突破!城开高速控制性工程吴家梁隧道掘进4000米大关_高速公路". www.sohu.com . Consultado el 11 de octubre de 2020 .
- ^ 网易 (11 de septiembre de 2021). "半小时!广邻、广武快速通道最新进展来了". www.163.com . Consultado el 18 de junio de 2022 .
- ^ "张家界这条高速公路最长隧雷家山隧道开工!_腾讯新闻". nuevo.qq.com . Consultado el 18 de junio de 2022 .
- ^ "El túnel estratégico Z-Morh en Cachemira se completará en junio de 2021, según informa el sitio oficial". The Economic Times .
- ^ "Túnel Hranjen, Goražde, Bosnia y Herzegovina". Klix.ba. 2019-10-11 . Consultado el 12 de octubre de 2019 .
- ^ "瑞丽至孟连高速3个特长隧道取得重大进展_工作推进_云南省人民政府门户网站". www.yn.gov.cn. Consultado el 24 de junio de 2022 .
- ^ "勐绿高速公路首座隧道二衬混凝土顺利浇筑_经济_云南频道_云南网". yn.yunnan.cn . Consultado el 24 de junio de 2022 .
- ^ "泸石高速奎武隧道进口端斜井顺利进洞 - 行讯宝-工程行业资讯、标讯、分类信息App". Hangxunbao.com . Consultado el 24 de junio de 2022 .
- ^ "康略高速黑马关特长隧道掘进突破1000米大关_施工_项目_应用". www.sohu.com . Consultado el 24 de junio de 2022 .
- ^ "中铁一局,中铁二十三局,道隧集团,四川公路桥梁建设集团新中西南地区项目_设计". www.sohu.com . Consultado el 24 de junio de 2022 .
- ^ 网易 (25 de septiembre de 2020). "景泰至礼县高速公路陇南段礼县隧道顺利进洞施工". www.163.com . Consultado el 24 de junio de 2022 .