The High Speed Rail Authority (HSRA) is a statutory agency of the Australian Government tasked with advising on, planning, developing, and overseeing the construction and operation of an eventual high-speed rail network along Australia's eastern seaboard.
The HSRA was part of a commitment made in November 2021 by the then-opposition Labor Party (and a further announcement by its leader Anthony Albanese in January 2022) to build a high-speed rail line from Sydney to Newcastle, as part of an eventual network from Melbourne to Brisbane. Legislation to establish the HSRA was introduced in September 2022 and received assent in December 2022. The HSRA commenced operations on 13 June 2023, and its CEO was appointed on 11 January 2024. The National Faster Rail Agency was abolished on the commencement of the High Speed Rail Authority.
The HSRA is currently developing a business case for the Sydney to Newcastle section of the East Coast high-speed rail network, with $500 million allocated by the Australian Government for planning and corridor works.[2] Tenders for the development of the business case were released in March 2024 and successful tenderers were announced in June 2024. These announcements were followed in August 2024 by the commencement of geotechnical investigations and a briefing for industry. In December 2024, the business case for the Sydney to Newcastle section was provided to the government, along with a Product Definition Report.[note 1][4][5] The business case has been reviewed by Infrastructure Australia,[6] and its assessment was released on 6 November 2025.
Establishment and previous incarnations
Prior to the establishment of the Authority, the government had tasked the National Faster Rail Agency to explore a variety of faster rail options.[7][8]
In a speech in Newcastle on 2 January 2022, then-Opposition Leader Anthony Albanese promised, if he was successful in the 2022 federal election, to build a high-speed rail line between Sydney and Newcastle. Part of this commitment included an allocation of $500 million for planning, land purchases and early works, along with establishing a dedicated authority to deliver an eventual line from Melbourne to Brisbane.[9] This mirrored a similar announcement by the Labor Party in November 2021,[10] and a similar promise made at the 2019 federal election.[11] The promise was criticised by members of the Liberal Party, with the then-Urban Infrastructure Minister Paul Fletcher saying that Albanese "[needed] to come clean" regarding the cost and the party vice-president Teena McQueen saying the proposal was "not cost effective".[12][13] In contrast, The Australia Institute's Ebony Bennett said that it was a "smart announcement", adding that it would be popular "in areas [...] that stand to benefit a lot", including Newcastle.[14]
In September 2022, the recently elected Albanese government introduced legislation to establish a new national High Speed Rail Authority.[15][16] The Infrastructure Minister Catherine King said the Authority would have an expert board and be tasked with overseeing "the construction and operation of a high-speed rail network along Australia's eastern seaboard" between Melbourne, Canberra, Sydney and Brisbane.[17] The authority would consult with state governments, give advice to the federal government, and develop standards to ensure an interoperable high-speed rail network across jurisdictions.[16] King announced the Authority would advance the government's first priority of providing high-speed rail between Sydney and Newcastle, to which the government committed $500 million to commence early works and secure corridors.[15] The Bill would abolish the National Faster Rail Agency and absorb its functions into the new authority.[17] The Bill was passed by both houses on 24 November 2022, and gained assent on 12 December 2022.[16]
The authority commenced operations on 13 June 2023, at which time the National Faster Rail Agency ceased operations, and all employees were transferred to either the Authority or the DITRDCA.[18] The CEO Tim Parker was appointed on 11 January 2024.[19][20]
Board structure
Per the High Speed Rail Authority Act 2022, the board of the Authority consists of the Chair and four other members, who are all appointed by — and report to — the minister. The board is required to hold at least four meetings per year.[21]
As of 2024, the board members are:[21]
- Jill Rossouw, Chair
- Gillian Brown, Member
- Ian Hunt, Member
- Dyan Perry OBE, Member
- Neil Scales OBE, Member
Planning
Sydney to Newcastle section
First half of 2024
On 30 January 2024, it was announced that $78.8 million of funding would be released for the development of a business case for the Sydney to Newcastle section of the high-speed rail network.[22][23] The tenders for the business case were released in March 2024 and were split into eight packages, including:[24]
- Project controls (costs, schedule and risk)
- Rail operations planning
- First Nations participation and engagement, and
- Commercial, delivery strategy and industry engagement.
En respuesta a los documentos de licitación que sugerían considerar una posible estación en Broadmeadow (en contraste con el informe de la Fase 2 de 2013, que sugería una estación "ubicada fuera de las áreas urbanas actuales" de Newcastle), Tim Parker dijo que una línea de Sídney a Broadmeadow era "factible". [ 25 ] [ 26 ]
Los licitadores ganadores fueron anunciados el 13 de junio de 2024, y los contratos fueron adjudicados a las siguientes empresas: [ 27 ] [ 28 ]
Segunda mitad de 2024
Las investigaciones geotécnicas (que comenzaron con la perforación de 27 pozos a lo largo del corredor de Sídney a Newcastle) se iniciaron el 26 de agosto de 2024, antes de una sesión informativa para la industria al día siguiente. [ 32 ] [ 33 ] A partir de noviembre de 2024, se perforaron seis de estos pozos en Brisbane Water y el río Hawkesbury en la Costa Central utilizando dos plataformas de perforación. [ 34 ] [ 35 ]
El asesor geológico de la Autoridad, David Och, afirmó que la zona a lo largo de la ruta propuesta presentaba una gran diversidad de paisajes (desde "espectaculares mesetas de arenisca" hasta "valles profundamente disectados"), zonas de falla y diques ígneos , además de distintos tipos de vegetación. Según Och, estas características eran "el foco principal" de las investigaciones. Otro aspecto central de las investigaciones geotécnicas era el río Hawkesbury, debido a la necesidad de determinar el "espesor de los sedimentos, la profundidad y la calidad del lecho rocoso" del río. Estas investigaciones, según Och, tenían como objetivo permitir "perforaciones futuras para abordar cualquier riesgo geotécnico" identificado durante las investigaciones geotécnicas iniciales y garantizar "la seguridad y la eficiencia en la construcción futura". [ 36 ]
En una sesión informativa de la industria para la sección de Sídney a Newcastle el 27 de agosto de 2024, Tim Parker hizo una presentación sugiriendo lo siguiente: [ 37 ]
- Up to 100 km (62 mi) of the line would be in tunnels, including beneath the Hawkesbury River and Brisbane Water,
- The section between Gosford and Newcastle would largely be above-ground, and
- The first construction contracts could be signed by 2027 if the federal government made an investment in 2025.
Parker also gave the following target travel times:[37]
An information hub and office were opened in Newcastle in December 2024. Parker said that the hub would enable people to "come in and have a discussion" about the project, and to enable people who were "very excited [...] but not sure" what high-speed rail was to see "what high-speed rail [sic] will look like".[38]
Business case assessment
On 6 November 2025, Infrastructure Australia released a positive assessment of the business case, recommending that a two-year "development phase" go ahead. It outlines a potential opening date of 2037 for a Central Coast to Newcastle section, before being extended to Sydney by 2039 and to Western Sydney Airport by 2042. The CEO of Public Transport Association Australia New Zealand (PTAANZ) Lauren Streifer and the Central Coast regional director of the Property Council Nuatali Nelmes expressed support for the assessment, along with HSRA CEO Parker and transport minister Catherine King,[39][40] although Nelmes later said that improved housing strategies and delivery would be "essential" for high-speed rail to create "liveable, affordable communities".[41]
Comments
In January 2025, the head of the Australasian Railway Association Caroline Wilkie commented that the proposed rail line provided an "opportunity to capitalise on" the workforce developed by underground metro rail projects in Sydney, Brisbane and Melbourne. Wilkie also said that the line, if delivered, would "unlock opportunities for economic and social prosperity".[42]
At the time of the industry briefing in August 2024, the shadow transport minister Bridget McKenzie commented that while the Coalition would "deliver [sic] the business case" for the Sydney to Newcastle section, she also commented that details were yet to be provided on "where it's [sic] proposal is going, what it will cost or who will be paying for it".[43] When drilling commenced on the Central Coast in November 2024, McKenzie labelled it a "Utopia-like stunt" that suggested "‘work has started’ on a [sic] high-speed rail" and opined that unless details were provided on funding and delivery, high-speed rail would be "just another infrastructure fantasy project".[35]
In November 2024, former Liberal member for Bennelong John Alexander suggested building stations just outside of major towns and cities to allow for new housing development. Alexander opined that this would allow for significant value capture and therefore allow the government to recoup the cost of the project. He criticised the potential station locations for this reason, saying that a station in Gosford would not result in an "uplift" in property values due to it being built up and surrounded by water, while saying that a potential station in Broadmeadow was "equally flawed".[44]
The preference for Central being the main station was also criticised on demographic and practical grounds:
- The Lord Mayor of Parramatta Martin Zaiter suggested that Central was no longer the centre of Sydney's population, and that the choice of station reflected a view of Sydney that was "rooted in the past".[45]
- Andrew McNaughton, who led an investigation into high-speed rail in NSW from late 2018, thought that Central was a "very constrained site" in terms of underground works, and that there were "better places" to locate a station.[45]
Future sections
Melbourne to Canberra section
In October 2024, Tim Parker said that the Victorian end of the line should start at Southern Cross railway station (although he thought a link to Geelong "would make sense") and include a stop at Melbourne Airport. The line would extend on to Shepparton, Albury and would eventually connect with the line from Sydney. Parker also said that the line should both be built and start operating in small segments.[46]
Notes
- ^ Según la Autoridad, el informe incluiría recomendaciones sobre la preservación del corredor, la participación de las partes interesadas y la planificación ambiental para toda la red. [ 3 ]
- ^ Con la asistencia de socios especializados (incluido Ineco ) [ 29 ] [ 30 ]
- ^ Posteriormente se asoció con SYSTRA [ 31 ]
- ^ Estación potencial.
Véase también
Referencias
- ^ "Declaraciones presupuestarias de la cartera 2025-26". Cartera de Infraestructura, Transporte, Desarrollo Regional, Comunicaciones y Artes (PDF) . pág. 272. ISBN 978-1-922879-74-5. Archivado (PDF) del original el 11 de agosto de 2025. Recuperado el 6 de noviembre de 2025 – a través de la Mancomunidad de Australia.
- ^ " Proyecto | Autoridad Ferroviaria de Alta Velocidad | Autoridad Ferroviaria de Alta Velocidad" . www.hsra.gov.au. Archivado del original el 11 de agosto de 2024. Consultado el 15 de septiembre de 2024 .
- ^ "Tren de alta velocidad - Autoridad del Tren de Alta Velocidad" . Autoridad del Tren de Alta Velocidad . Consultado el 31 de octubre de 2024 .
- ^ "Informe anual de la Autoridad Ferroviaria de Alta Velocidad 2023-24" (PDF) . Autoridad Ferroviaria de Alta Velocidad . Consultado el 31 de octubre de 2024 .
- ^ O'Sullivan, Matt (7 de enero de 2025). "Revelado: Coste colosal de la línea ferroviaria de alta velocidad de Sídney a la Costa Central" . The Sydney Morning Herald . Consultado el 8 de enero de 2025.
[El gobierno de Albanese] recibió el mes pasado un estudio de viabilidad para una línea ferroviaria de alta velocidad que conectaría Newcastle con Sídney.
- ^ "El gobierno finaliza la evaluación del estudio de viabilidad del tren de alta velocidad Sídney-Newcastle" . Newcastle Herald . 16 de octubre de 2025. Consultado el 5 de noviembre de 2025 .
- ^ "Presupuesto federal 2019: solución de tren rápido para la congestión del tráfico" . Australian Financial Review . 2 de abril de 2019. Archivado del original el 20 de julio de 2019. Consultado el 20 de julio de 2019 .
- ^ "Agencia Nacional de Ferrocarriles de Alta Velocidad | Agencia Nacional de Ferrocarriles de Alta Velocidad (NFRA)" . Agencia Nacional de Ferrocarriles de Alta Velocidad . Archivado del original el 19 de julio de 2019. Consultado el 6 de julio de 2024 .
- ^Duke, Jennifer (1 January 2022). "Labor promises $500m for Sydney to Newcastle leg of future high-speed rail". The Age. Archived from the original on 12 August 2024. Retrieved 12 August 2024.
- ^"High Speed Rail Authority: Labor will kick start high speed rail"(PDF). Australian Labor Party. 15 November 2021. Archived(PDF) from the original on 16 August 2024. Retrieved 16 August 2024 – via Parliament of Australia ParlInfo.
- ^Lynch, Lydia (21 March 2019). "The duelling rail plans for south-east Queensland". The Age. Archived from the original on 12 April 2019. Retrieved 20 August 2024.
- ^"Albanese's high-speed rail plan criticised for lacking detail". The Australian. 2 January 2022. Retrieved 1 October 2024.
'[Albanese] needs to come clean with the Australian people, that's $200-$300 billion on any credible estimate,' Urban Infrastructure Minister Paul Fletcher said.
- ^"Labor's high-speed rail line 'is not going to happen'". The Australian. 3 January 2022. Retrieved 1 October 2024.
Labor's proposed high-speed rail line between Sydney and Newcastle is never going to happen because it is "simply not cost effective," according to Liberal Party federal vice-president Teena McQueen.
- ^"'Smart announcement': Labor pitches high-speed rail between Newcastle and Sydney's CBD". The Australian. 2 January 2022. Retrieved 7 October 2024.
"I think it's a smart announcement that Labor sticks with this highspeed rail policy; it will be popular in areas like Newcastle that stand to benefit a lot."
- ^ ab"High-speed rail plans to be put on track". The West Australian. 7 September 2022. Archived from the original on 8 September 2022. Retrieved 8 September 2022.
- ^ a b c Parlamento de la Commonwealth, Canberra (8 de septiembre de 2022). " Proyecto de Ley de la Autoridad Ferroviaria de Alta Velocidad de 2022" . www.aph.gov.au. Archivado del original el 8 de septiembre de 2022. Consultado el 8 de septiembre de 2022 .
- ^ a b Parlamento de la Commonwealth, Canberra (8 de septiembre de 2022). "Catherine King, Proyecto de Ley de la Autoridad Ferroviaria de Alta Velocidad de 2022, Discurso de la Ministra en la Segunda Lectura" . parlinfo.aph.gov.au . Archivado del original el 6 de octubre de 2022. Consultado el 8 de septiembre de 2022 .
- ^ "Presupuesto octubre 2022-23 - Agencia Nacional de Ferrocarriles de Alta Velocidad - october_2022-23_infra_pbs_14_nfra.pdf" (PDF) . Departamento de Infraestructura, Transporte, Desarrollo Regional, Comunicaciones y Artes . Consultado el 6 de julio de 2024 .
- ^ "Anunciado el primer director ejecutivo de la Autoridad Ferroviaria de Alta Velocidad - Ministros del Departamento de Infraestructura" . 11 de enero de 2024. Archivado del original el 21 de abril de 2024. Consultado el 21 de abril de 2024 .
- ^ King, Catherine (5 de junio de 2023). "Todos a bordo de la Autoridad Ferroviaria de Alta Velocidad - Ministros del Departamento de Infraestructura" . Archivado del original el 17 de enero de 2024. Recuperado el 17 de enero de 2024 .
- ^ a b "Acerca de nosotros - Autoridad del Ferrocarril de Alta Velocidad" . Autoridad del Ferrocarril de Alta Velocidad . Archivado del original el 12 de mayo de 2024. Recuperado el 5 de julio de 2024 .
- ^ "Financiamiento liberado para el estudio de viabilidad del tren de alta velocidad Sídney-Newcastle - Ministros del Departamento de Infraestructura" . Archivado del original el 21 de abril de 2024. Consultado el 21 de abril de 2024 .
- ^ Ikonomou, Tess (30 de enero de 2024). "Australia gasta 78 millones de dólares en el proyecto del tren de alta velocidad" . Newcastle Herald . Archivado del original el 21 de abril de 2024. Recuperado el 21 de abril de 2024 .
- ^ "Licitaciones para desarrollar un estudio de viabilidad para una red ferroviaria de alta velocidad" . Newcastle Herald . 17 de marzo de 2024. Archivado del original el 21 de abril de 2024. Consultado el 21 de abril de 2024 .
- ^"High Speed Rail Authority boss says Broadmeadow-Central line 'achievable'". Newcastle Herald. 31 March 2024. Archived from the original on 21 April 2024. Retrieved 21 April 2024.
- ^"High Speed Rail Authority pushes Broadmeadow station option". Newcastle Herald. 27 March 2024. Archived from the original on 21 April 2024. Retrieved 21 April 2024.
- ^"'Very serious': firms named to shape high-speed rail business case". Newcastle Herald. 13 June 2024. Archived from the original on 15 June 2024. Retrieved 15 June 2024.
- ^"World-leading experts on board for high-speed rail". Ministers for the Department of Infrastructure, Transport, Regional Development, Communications and the Arts. Archived from the original on 13 June 2024. Retrieved 15 June 2024.
- ^"Post". Arcadis. Archived from the original on 6 July 2024. Retrieved 6 July 2024.
- ^Magariño, Javier (21 June 2024). "Ineco analizará la viabilidad de la primera línea de alta velocidad en Australia" [Ineco to analyse the feasibility of the first high-speed line in Australia] (in Spanish). Cinco Días. Archived from the original on 4 August 2024. Retrieved 6 July 2024.
- ^"Engineering firms Arup and SYSTRA team up for high speed rail". Newcastle Herald. 9 August 2024. Archived from the original on 10 August 2024. Retrieved 20 August 2024.
- ^"High Speed Rail Authority drills under Newcastle as project builds steam". Newcastle Herald. 26 August 2024. Archived from the original on 27 August 2024. Retrieved 26 August 2024.
- ^Coade, Melissa (26 August 2024). "Drilling commences for Sydney to Newcastle high-speed rail business case". The Mandarin. Archived from the original on 28 August 2024. Retrieved 28 August 2024.
- ^Brissenden, Neve (5 November 2024). "Drilling begins on east coast high-speed rail route". Newcastle Herald. Retrieved 5 November 2024.
- ^ abVisontay, Elias (5 November 2024). "Drilling for Sydney to Newcastle high-speed rail begins but Labor accused of uncosted 'fantasy project'". The Guardian. ISSN 0261-3077. Retrieved 6 November 2024.
Six holes in the ground at the end of the first term of the Albanese government is a Utopia-like stunt to suggest 'work has started' on a high-speed rail," [Bridget] McKenzie told Guardian Australia. "We are waiting for the Albanese government to provide any details at all on how they intend to fund a [sic] high-speed rail and then build it. Minister King can put out a press release with a stamp that says 'work has started' but until the prime minister comes clean on how he will deliver on his election promise, it is just another infrastructure fantasy project.
- ^Kajastie, Nia (11 September 2024). "Ground investigations begin for Australia's first high speed rail line". Ground Engineering. Archived from the original on 11 September 2024. Retrieved 11 September 2024.
- ^ ab"Newcastle-Sydney high-speed rail possible by 2037 as tunnel plan emerges". Newcastle Herald. 27 August 2024. Archived from the original on 28 August 2024. Retrieved 27 August 2024.
- ^Swinton, Sage (13 December 2024). "Take a look inside potential high-speed rail carriages and stations". Newcastle Herald. Archived from the original on 13 December 2024. Retrieved 13 December 2024.
- ^Forster, Srah (6 November 2025). "High-speed rail business case linking Sydney and Newcastle supported by government assessment body". ABC Central Coast. Retrieved 6 November 2025 – via ABC News.
- ^"Preferred high-speed rail option connects Newcastle to Western Sydney airport". www.newcastleherald.com.au. 6 November 2025. Retrieved 6 November 2025.
- ^"Will the high-speed rail alleviate the Hunter's housing stress?". www.newcastleherald.com.au. 8 November 2025. Retrieved 9 November 2025.
- ^Kelly, Matthew (13 January 2025). "High-speed rail could trigger Hunter jobs boom". Newcastle Herald. Archived from the original on 14 January 2025. Retrieved 13 January 2025.
- ^"High-speed rail team must show how it can get passengers on board". Newcastle Herald. 28 August 2024. Archived from the original on 29 August 2024. Retrieved 29 August 2024.
The Coalition is committed to delivering the high-speed rail business case," Senator [Bridget] McKenzie said. "To date, Labor is yet to provide any details on where it's [sic] proposal is going, what it will cost or who will be paying for it.
- ^Visontay, Elias (13 November 2024). "Australia's high-speed rail dream is doomed if stations are built in wrong place, ex-MP says". The Guardian. ISSN 0261-3077. Retrieved 13 November 2024.
- ^ abO'Sullivan, Matt (9 January 2025). "What stands in the way of high-speed rail between Sydney and Newcastle". The Age. Retrieved 9 January 2025.
- ^Hatch, Patrick (5 October 2024). "High Speed Rail boss pushes fast train link to include Melbourne Airport stop". The Age. Archived from the original on 6 October 2024. Retrieved 6 October 2024.
External links
- Official website
- High Speed Rail Authority on LinkedIn
- Transporte ferroviario en Australia
- Tren de alta velocidad en Australia
- Ferrocarril de alta velocidad en Oceanía