The Sydney light rail network is a light rail system serving the city of Sydney, New South Wales, Australia. There are four passenger routes across two physically separate parts of the network: the inner-city Sydney Light RailL1 Dulwich Hill, L2 Randwick, and L3 Kingsford Lines, and the Parramatta Light RailL4 Westmead & Carlingford Line. The total network comprises 58 stops and a length of approximately 48.8 km (30.3 mi), making it the second largest light rail network in Australia behind the tram system in Melbourne, Victoria.
The network is managed by Transport for NSW, with day-to-day operations contracted to Transdev. In the 2023–24 financial year, 40.59 million passenger journeys were made on the network, equating to over 110,000 journeys per day.
History

In the 19th and 20th centuries, Sydney developed an extensive tram network, which grew to be the second largest in the Southern Hemisphere and second largest in the Commonwealth after London. The increasing rate of private car ownership, the perception that trams contributed to traffic congestion and the general rundown conditions of the network due to the lack of funding after World War II led to the progressive replacement of tram services with buses, with the final section of the tram network closing on 25 February 1961.
In the 1980s and 1990s, the inner city areas of Darling Harbour and Pyrmont were the subject of an urban renewal program. In 1988 the Sydney Monorail opened, connecting Darling Harbour to the city centre. With poor integration between the monorail and other transport modes and the increasing redevelopment of the Pyrmont peninsula – including the establishment of Sydney's first legal casino – it was decided to convert a disused section of the Metropolitan Goods railway line into a light rail line. A section of track between Pyrmont and Haymarket was upgraded and a new on-street section was built to link the line to Central station. The line was set up as a public-private partnership. It opened in August 1997, running between Central Station and Wentworth Park, Pyrmont.
The private owner soon made proposals for a western extension continuing along the disused goods line, plus a new line through the city centre from Central to Circular Quay.[4] The western extension opened in 2000, terminating at Lilyfield, but a new line through the city centre was not built in this decade.
By contrast, the 2010s saw significant investment in the light rail system. This included the announcement and delivery of multiple new infrastructure projects, integration of ticketing with the city's other transport modes, the introduction of new trams and the transfer of the network to full public ownership. The boon coincided with a period of investment in urban railways across Sydney and Australia; the state transport minister in 2020 labelled Sydney a "train city" in reference to its various rail modes.[5][6]
Ownership and operation
Public-private partnership

In March 1994, the Sydney Light Rail Company (SLRC) was formed. SLRC was awarded a 30-year concession to operate the light rail system until February 2028 when ownership would pass to the New South Wales Government.[7] The contract gave the company significant control over the commercial arrangements relating to future extensions or interconnecting lines.[8] Operation of the line was contracted to TNT Transit Systems, which also owned the Sydney Monorail.[9]
In August 1998, the SLRC purchased TNT Transit Systems as part of a joint venture with CGEA Transport.[10][11] This resulted in CGEA Transport taking over the light rail operating contract. CGEA Transport and its successors have operated the inner city light rail network ever since.[12]
In early 2001, Connex, renamed from CGEA Transport in 1999, sold its share of the monorail to the SLRC, bringing the monorail and light rail under unified ownership and leading to the formation of Metro Transport Sydney.[13][14]
En marzo de 2012, el Gobierno de Nueva Gales del Sur compró Metro Transport Sydney, y la empresa quedó bajo el control de Transport for NSW . [ 15 ] La compra eliminó las restricciones contractuales para la expansión del sistema de tren ligero y permitió al gobierno desmantelar el monorraíl, lo que facilitó sus planes para la remodelación del Centro de Convenciones y Exposiciones de Sídney . [ 16 ] [ 17 ]
Propiedad del gobierno
A partir de julio de 2013, la marca Metro Light Rail se eliminó gradualmente como parte de un cambio de marca y reorganización más amplios de los servicios de transporte público en Nueva Gales del Sur. [ 18 ] En septiembre de 2014, se completó el proceso de cierre de Metro Transport Sydney y la transferencia de activos a Transport for NSW . [ 19 ]
Los antiguos propietarios privados habían fijado sus propias tarifas, que solían ser más altas que las aplicadas a los autobuses. Las tarifas del tren ligero se basaban originalmente en una estructura tarifaria zonal geográfica de dos zonas. Después de que el gobierno comprara MTS, las tarifas del tren ligero se equipararon a las de los autobuses, utilizando una estructura tarifaria basada en la distancia, cuando el sistema de billetes con tarjeta Opal se extendió al tren ligero en diciembre de 2014. [ 20 ] La extensión de Opal al tren ligero también eliminó la necesidad de que los agentes de atención al cliente vendieran billetes de papel a bordo.
Tras el anuncio del tren ligero del distrito central de negocios (CBD) y del sureste, el gobierno decidió agrupar el contrato que abarcaba la construcción de la nueva línea con la operación y el mantenimiento de ambas líneas de la red del centro de la ciudad. En diciembre de 2014, Transport for NSW adjudicó el contrato al consorcio ALTRAC Light Rail. Esto permitió que Transdev Sydney , el operador bajo el contrato anterior, continuara operando y manteniendo la red como parte del consorcio. [ 21 ] El contrato de operación comenzó el 1 de julio de 2015 y se extiende hasta 2034. [ 22 ] [ 23 ]
After taking control of the Inner West Light Rail and announcing the CBD and South East Light Rail, the government moved to establish a separate network centred around the Western Sydney suburb of Parramatta. Transdev was contracted to operate the Parramatta network as part of the Great River City Light Rail consortium. This contract runs for eight years from construction completion, with a possible extension of up to an additional ten years.[24]
In 2026, six trams caught fire within four months. This followed a program that was intended to reduce the occurrence of these issues by installing safer batteries on the trams. The Office of Transport Safety Investigations is undertaking an investigation into these issues.[25]
Operations
Lines
Sydney's light rail network consists of:
- Inner West Light Rail – serviced by L1 Dulwich Hill Line
- CBD and South East Light Rail – serviced by L2 Randwick Line and L3 Kingsford Line
- Parramatta Light Rail – serviced by L4 Westmead and Carlingford Line

L1 Dulwich Hill Line
The L1 Dulwich Hill Line is the network's original passenger route, which first commenced in August 1997. It operates along the 12.8-kilometre (8 mi) Inner West Light Rail between Central Station and Dulwich Hill, stopping at 23 stops along the route. It connects Sydney's Inner West with the Pyrmont peninsula, Darling Harbour and the southern end of the city centre.
The majority of the Inner West Light Rail line is along the alignment of a former freight railway line, with a short on-street section at the city end. The line opened between Central railway station in the city and Wentworth Park, Pyrmont on 11 August 1997,[26] then extended west to Lilyfield in August 2000, and then southwest to Dulwich Hill in March 2014.[27][28]
From late October 2021 to February 2022, services were replaced by buses after major cracks were found in all 12 Urbos 3 trams serving the line.[29] Limited service was then restored with borrowed Citadis trams from the CBD and South East Light Rail.
L2 Randwick & L3 Kingsford Lines

L2 Randwick Line services commenced on 14 December 2019, while L3 Kingsford Line services commenced operations on 3 April 2020.[30][31] They operate on the CBD and South East Light Rail, between Circular Quay at the northern end of the city centre to Central Station at the southern end, then continuing to the south-eastern suburbs.
CBD and South East Light Rail were built to reduce bus congestion in the CBD and provide higher capacity public transport to the Sydney Football Stadium, Sydney Cricket Ground, Randwick Racecourse and the University of New South Wales, which were previously served only by buses. In contrast to the Inner West Light Rail, the line is mostly on-street and follows a similar path to routes used by the former tramway network. Major construction began in October 2015.[32]
L4 Westmead and Carlingford line
Parramatta Light Rail is the name given to two lines that converge on the Western Sydney centre of Parramatta. These lines will have no connection to the Inner West or CBD and South East lines.
The first line runs from Carlingford to Westmead via the Parramatta CBD. It includes the conversion of most of the former heavy rail Carlingford line to light rail standards. Construction began in 2018 and was opened to the public on 20 December 2024.[33]
The preferred route for the second line was announced in October 2017. This line branches from the first line at Rydalmere and travels through Ermington, Melrose Park, Wentworth Point and on to the Sydney Olympic Park events precinct.[34]
Under construction
In February 2024, Stage 2 of the Parramatta Light Rail linking Parramatta to Sydney Olympic Park via Rydalmere, Melrose Park and Wentworth Point received planning approval after the New South Wales Government invested $200 million to expedite planning processes for the project in its 2023–24 state budget.[35]
Rolling stock

All services on the Inner West Light Rail were previously operated by a single class of tram. A second class was introduced to operate services on the CBD and South East Light Rail. All vehicles to have operated on the system have been articulated, low floor and bi-directional. The system uses standard gauge track and 750 voltdirect current electrification.
Both lines use different specifications on a range of measures including gaps between platforms and carriages, height and width of the actual track, clearances between the track corridor and its surrounds, and distance between the back wheels of the trams. As a result, Urbos 3 trams used on the Inner West Light Rail (L1 Dulwich Hill) line are unable to serve on the CBD and South East Light Rail (L2 Randwick and L3 Kingsford) lines[36] However, Citadis 305 trams used on the CBD and South East Light Rail are able to run on the Inner West Light Rail as the vehicles are narrower.[37] This was to allow the fleet to access the Lilyfield maintenance centre via the Inner West Light Rail.[38] This also allowed for Citadis trams to be used for L1 Dulwich Hill services on the Inner West Light Rail.
Urbos 3 and Urbos 100

Inner West Light Rail
Tras la extensión de 5,6 km (3,5 mi) del Inner West Light Rail hasta Dulwich Hill, se necesitó más material rodante para dar soporte a los servicios y circular junto a los Variotram que habían estado prestando servicio en la línea desde la apertura del primer tramo en 1997. [ 39 ] En agosto de 2012 se adjudicó una licitación para seis Urbos 3 a Construcciones y Auxiliar de Ferrocarriles (CAF). [ 40 ] La primera unidad llegó a Sídney el 19 de diciembre de 2013 y entró en servicio el 24 de julio de 2014. [ 41 ] [ 42 ] Todos estaban en servicio en agosto, lo que permitió devolver a España los Urbos 2 arrendados. [ 39 ]
El 11 de octubre de 2013, el Gobierno anunció un pedido de seis Urbos 3 adicionales para reemplazar a los Variotram. [ 43 ] Todos los Urbos 3 del pedido adicional habían entrado en servicio a finales de junio de 2015. [ 21 ] [ 44 ]
Los Urbos 3 tienen aproximadamente 33 metros (108 pies) de largo y cuentan con dos puertas dobles y dos individuales a cada lado. Los asientos del primer lote generalmente están en configuración transversal, a 90 grados de los lados del vehículo. [ 45 ] El segundo lote reemplazó algunos de los asientos transversales con asientos longitudinales, lo que proporcionó más espacio para estar de pie. Anuncios de voz digitales y pantallas internas de matriz de puntos brindan información sobre la próxima parada. Tienen una capacidad estándar de 206 pasajeros y una capacidad de 272 en caso de necesidad. [ 46 ] Los vehículos están numerados del 2112 al 2114-2124. El 2113 se omitió debido a la superstición, particularmente entre los chinos que viajan al casino Star en tren ligero, sobre los números que terminan en 13. [ 47 ]
En junio de 2021, se firmó un contrato con CAF para cuatro unidades Urbos 100 (una variante del Urbos 3) de cinco módulos. [ 48 ]
El 28 de octubre de 2021, se suspendió el servicio del tren ligero Inner West después de que se descubrieran grietas en las soldaduras de algunos de los vehículos Urbos 3 durante inspecciones rutinarias. [ 49 ]
Tren ligero de Parramatta
Se adquirieron trece vagones Urbos 100 para la primera etapa del tren ligero de Parramatta. Cada tranvía tiene 45 metros (148 pies) de largo y consta de siete módulos. [ 24 ] Estos vehículos permitirán el funcionamiento inalámbrico mediante baterías, que se utilizarán en los tramos urbanos de la línea alrededor de Parramatta y Westmead. [ 50 ] [ 51 ]
Citadis 305
As part of the winning consortium to build and operate the CBD and South East Light Rail, Alstom supplied sixty Citadis 305 trams.[52] Each vehicle consists of five sections, and they are coupled together to operate in pairs.[53] Original plans for the line intended for the trams to be approximately 45 metres (148 ft) long and operate as single units. Wire-free operation in a section of George Street between Bathurst Street and Circular Quay was to be achieved via battery storage.[54][55] In December 2014, it was announced that Alstom's proprietaryAPS technology would be used in place of batteries. The length of the trams would also be reduced, but they would now operate in pairs, giving each pair a total length of approximately 67 metres (220 ft).[56]
The first unit was completed in May 2017.[57][58] The first six were manufactured in La Rochelle, France, the remaining 54 in Barcelona, Spain.[59] They are numbered 001–060.
After the entire Urbos 3 fleet of the Inner West Light Rail was withdrawn for repairs in November 2021, Citadis trams were borrowed from the CBD and South East Light Rail and tested on the Inner West Light Rail from December 2021.[37] The Citadis vehicles began services on the Inner West Light Rail on 12 February 2022 on a temporary basis until the Urbos 3 fleet could be repaired and brought back into service.[60][61] They continue to operate following the reintroduction of the Urbos 3s.
Withdrawn
Variotram

The network's original rolling stock was the Variotram which was introduced with the opening of the first section of the Inner West Light Rail in 1997. Seven German-designed vehicles were manufactured by Adtranz in Dandenong.[62] The Variotram design is modular and was extended for the Sydney system. The capacity of the vehicles was 217 passengers, of which 74 were seated.[63] The first was damaged in an accident near Tarcutta while on its delivery run and had to be returned to Melbourne for repairs.[64] On tests up to three trams were coupled together allowing a maximum capacity of 600 passengers if required.[62]
The vehicles had a floor-to-rail height of 30 centimetres (12 in) and the bogies had no axles between the wheels and were powered by hub motors.[62] The design weight was reduced to compensate for the addition of climate-control air-conditioning equipment. Each was fitted with three double doors on each side which had enhanced safety systems with obstacle detection interlocked with the traction system.[62] Seats were generally in the transverse configuration – at 90 degrees to the sides of the vehicle. In 2014, the original external destination rolls were replaced with dot-matrix displays and digital voice announcements were installed. There were no internal displays. The last Variotram was withdrawn from service after operating overnight between Central and The Star on 27/28 May 2015.
After sustaining damage in a derailment at Glebe on 7 October 2013, Variotram number 2106 was scrapped.[65] The remaining six Variotrams were placed into storage in Penrith during the first half of 2015. Having been retained by Transport Heritage NSW, in October 2018, 2107 was placed in the custody of the Sydney Tramway Museum, Loftus.[66] The remaining five (2101–2105) were scrapped in early 2018.[67]
Urbos 2

Four leased CAF Urbos 2 trams were introduced on the Inner West Light Rail in 2014. They entered service to coincide with the extension of the line to Dulwich Hill, supplementing the Variotrams and ensuring service frequencies on the line could be maintained. The four trams had previously operated in Spain. Three units (2108–2110) were from Vélez-Málaga, where they operated between 2006 and 2012.[68] The other tram (2111) was from Seville. The first Urbos 2 arrived in Sydney on 4 September 2013.[69] Delivery was completed in November. The trams entered service on 22 March 2014, five days before the opening of the extension to Dulwich Hill.[70] Following the introduction of the Urbos 3 trams in July 2014, the Urbos 2s were withdrawn and returned to Spain.[42] The Urbos 2s were unpopular with passengers and attracted complaints.[71]
The trams featured four double and two single doors on each side. The seats were unpadded and were generally built in the longitudinal seating configuration – running parallel to the sides of the vehicle's body. Digital voice announcements and internal dot-matrix displays provided information about the next stop.
Patronage
The following table lists patronage figures for the network during the corresponding financial year. Australia's financial years start on 1 July and end on 30 June. Major events that affected the number of journeys made or how patronage is measured are included as notes.
Terminating trams at Circular Quay
The Kingsford branch terminus, Juniors Kingsford
- ↑Partial integration with main Sydney ticketing system in June 2011
- ↑Services suspended for much of October 2013 after double derailment
- ↑Dulwich Hill extension opened in March 2014
- ↑Opal introduced in December 2014
- ↑Non-Opal tickets discontinued in August 2016
- ↑L2 Randwick Line opened in December 2019 and L3 Kingsford Line opened in April 2020. Patronage was lower than anticipated due to people staying at home and not taking public transport to school or work during the COVID-19 pandemic
- ↑Figures based on Opal tap on and tap off data.
Ticketing and fares

The smartcard-based Opal card ticketing system, which was introduced to the network on 1 December 2014, is valid on metro, train, bus, ferry and light rail services.[80] Different fares apply for these modes, except that the same fares apply to light rail and buses. However, they are treated as separate modes for patronage counting purposes.[81] Light rail stops feature Opal top up machines that also sell Opal single trip tickets. The single trip tickets are more expensive than the standard Opal fare. They are only valid for travel on light rail and must be used on the day of purchase.[82] The following table lists Opal fares for reusable smartcards and single trip tickets.[83]
^ = $2.50 for Senior/Pensioner cardholders
Fares are calculated using a straight line distance between the origin and destination stops. No two stops on the existing line are located more than 8 kilometres (5.0 mi) from each other using this method, so the >8 km (5.0 mi) band does not apply to light rail services.
When it first opened, the Inner West Light Rail used its paper-based ticketing system. Paper tickets were originally sold from ticket machines on stop platforms but were later issued by conductors on board. During the 2010s, this system gradually merged with the broader Sydney ticketing system, culminating in the introduction of Opal and the withdrawal of all other tickets. This process was completed on 1 August 2016.[84]
Potential extensions
Several transport corridors have significant potential to allow for the growth of the network beyond its current route structure.
Anzac Parade

The New South Wales Government's 2012 policy document entitled Sydney's Light Rail Future proposed investigating an extension of the CBD and South East Light Rail along the southern Anzac Parade corridor.[85]
By 2014, an initial investigation had commenced. Three potential options were examined; a 1.9-kilometre (1.2 mi) extension to Maroubra Junction, a 5.1-kilometre (3.2 mi) extension to Malabar and an 8.2-kilometre (5.1 mi) extension to La Perouse.[86]
The government's 2018 Greater Sydney Services and Infrastructure Plan included a proposal for an extension to Maroubra Junction. The extension would however not be developed for at least 10 years.[87]
In 2026 Randwick Council announced plans to build a bike path along the median of Anzac Parade, which might prevent a future extension of the light rail.[88]
The Bays Precinct
The Bays Precinct is a large waterfront area to the west of the Sydney CBD being proposed for urban renewal by the New South Wales Government. The southern part of the precinct is served by the existing Inner West Light Rail. A planning document released by the government in October 2015 suggested light rail could be extended to the northern part of the precinct, possibly using the Glebe Island Bridge.[89]
The government's 2018 Greater Sydney Services and Infrastructure Plan included a proposal for a new line from Leichhardt North to Pyrmont via The Bays Precinct and the Glebe Island Bridge. It would connect with the existing Inner West Light Rail at both ends. The line would not be developed for at least 10 years.[87]
Parramatta Light Rail extensions
The New South Wales Government's 2012 policy document entitled Sydney's Light Rail Future proposed investigating a Western Sydney light rail network.[85] This led to several corridors being investigated in the early planning stages of the Parramatta Light Rail project. The final corridors selected for development were announced in 2015.
In early 2017, Transport for NSW had begun an investigation into an extension of the Parramatta Light Rail from Carlingford to Epping.[90]
The government's 2018 Greater Sydney Services and Infrastructure Plan proposed investigating unspecified extensions to the network. The extensions would not be developed for at least 10 years.[87]
In 2024, the NSW Legislative Council Inquiry into Current and future public transport needs in Western Sydney recommended "that the Government urgently investigate extending Stage 2 of the Parramatta Light Rail project so that the line no longer terminates at the Carter Street precinct but continues from there to terminate at Lidcombe railway station". This recommendation has been endorsed by Cumberland Council[91] and public transport advocacy groups such as EcoTransit Sydney.[92]
In September 2024, the Minns Labor Government committed $2.1 billion to stage two of Parramatta Light Rail to be routed through Melrose Park and Wentworth Point with stops in Sydney Olympic Park, Rydalmere, Ermington and Camellia.[93]
Green Square and Parramatta Road
In 2012, the City of Sydney Council recommended that a Light Rail link be built from the city to Green Square, to service the commercial and residential developments being built in the area, which is expected to become Australia's most densely populated precinct. The council has spent more than $30 million buying land for a light rail corridor.[94][95][96] In July 2015, New South Wales Transport Minister Andrew Constance stated that the area was likely to be served by a light rail link in the future.[97] This led to a decision in October by the City of Sydney to allocate $445,000 to develop plans for a light rail line from the city to Green Square. The council estimated a link would cost $350–500 million to build.[95] In 2023, the City of Sydney restated this intention in its draft 'Access Strategy', along with plans to extend the system further down George Street and Broadway, towards the University of Sydney. No formal announcements or works have begun.
In June 2024, ALTRAC proposed a plan for a new light rail corridor between Green Square and Leichhardt via Central.[98]
Bondi
In 2011, Waverley Council advocated for the extension of the light rail network to link the current infrastructure to Bondi Junction and Bondi Beach.[99][100] The council commissioned AECOM to undertake a feasibility assessment of the reintroduction of light rail on the corridor between Bondi Beach and Bondi Junction (Stage 1) and onto the CBD (Stage 2) to achieve mass transit of passengers and requested Transport for NSW consider the CBD to Bondi Beach corridor as a priority route in the Sydney Light Rail Plan.[101]
See also
References
- ↑"Number of trips by Line for Light Rail mode". 17 July 2024.
- ↑"Sydney's new light rail opens 14 December from Circular Quay to Randwick". Transport Info NSW. Archived from the original on 9 December 2019. Retrieved 5 December 2019.
- ↑"Sydney Inner West Light Rail Construction and Extension, Australia". Retrieved 6 December 2019.
- ↑"Nominated Loan Council Allocations For 1998–99". The Australian Treasury Website. 7 May 1998. Archived from the original on 6 April 2016. Retrieved 12 December 2015.
- ↑Wiggins, Jenny (10 January 2020). "How trains are helping Australia rethink cities". Australian Financial Review. Retrieved 17 July 2024.
- ↑Rabe, Tom (7 November 2020). "Four new trams promised for Sydney's crowded Inner West line". The Sydney Morning Herald. Retrieved 17 July 2024.
- ↑"Sydney Light Rail Extension – Stage 1 Inner West Extension Product Definition Report"(PDF). Transport NSW. July 2010. Archived from the original(PDF) on 7 April 2014.
- ↑Mills, Gordon (1997). "Light Rail in Sydney: Some Privatisation Lessons"(PDF). Agenda. 4 (4): 435, 438.
- ↑Mills, Gordon (1997). "Light Rail in Sydney: Some Privatisation Lessons"(PDF). Agenda. 4 (4): 433–444. Archived(PDF) from the original on 2 October 2019. Retrieved 2 October 2019.
- ↑"Stock Exchange Announcement". Hastings. 11 August 1998. Archived from the original on 10 July 2015. Retrieved 6 April 2019.
- ↑"TNT Annual Report 1998 – Non-core business". TNT. Archived from the original on 13 April 2014. Retrieved 27 September 2019.
- ↑"Light rail in Sydney". Transdev. Archived from the original on 16 August 2016. Retrieved 14 July 2016.
- ↑"Overview of Connex Worldwide and in Australia". Metro Light Rail. Archived from the original on 25 April 2003. Retrieved 1 February 2018.
- ↑"Technical Details (Metro Monorail)"(PDF). Metro Transport Sydney. 2005. Archived from the original(PDF) on 27 January 2005. Retrieved 1 February 2018.
- ↑Cosgriff, Stuart; Griffiths, Emily (5 July 2012). "Light rail strategy for Sydney". Clayton Utz Insights. Clayton Utz. Archived from the original on 14 July 2012. Retrieved 6 July 2012.
- ↑Campion, Vikki (23 March 2012). "Last stop for Sydney Monorail". The Daily Telegraph.
- ↑Tan, Gillian (23 March 2012). "Australian Infrastructure Fund sells Metro Transport stake". The Australian (from The Wall Street Journal).
- ↑Saulwick, Jacob (18 April 2013). "All together now: Sydney's public transport united under one 'brand'". The Sydney Morning Herald. Retrieved 5 April 2015.
- ↑"Transport for NSW 2013/14 Annual Report"(PDF). Transport for NSW. pp. 329, 344. Archived from the original(PDF) on 5 December 2014. Retrieved 1 January 2015.
- ↑"Opal to go live on light rail months ahead of schedule | Transport for NSW". www.transport.nsw.gov.au. Archived from the original on 26 November 2014. Retrieved 28 June 2025.
- 12Delivering an integrated light rail system: ALTRAC takes over operation of inner west light railArchived 6 July 2015 at the Wayback Machine Transport for NSW 2 July 2015
- ↑"CBD and South East Light Rail contract awarded with earlier delivery date". Transport for NSW. 18 December 2014. Archived from the original on 18 December 2014.
- ↑"Transdev consortium achieves financial close on Sydney Light Rail PPP" (Press release). Transdev. 25 February 2015. Archived from the original on 11 April 2015. Retrieved 5 April 2015.
- 12"Transdev Australasia consortium secures Parramatta Light Rail contract"(PDF). Transdev Australasia. 20 December 2018. Archived from the original(PDF) on 6 March 2019. Retrieved 21 December 2018.
- ↑Yin, Cindy (15 July 2026). "Why do Sydney's trams keep catching fire?". The Sydney Morning Herald. Retrieved 15 July 2026.
- ↑"Sydney's new light rail system". Railway Digest. September 1997. p. 14.
- ↑"Sydney's Tram Extension Opens". Railway Digest. September 2000. p. 4.
- ↑"Inner West Light rail extension now complete". Transport for NSW. 27 March 2014. Archived from the original on 27 March 2014.
- ↑"Sydney's inner-west light rail shut down for up to 18 months due to cracks". ABC News. 5 November 2021. Retrieved 5 November 2021.
- ↑Final stage of Sydney's CBD light rail opensSydney Morning Herald 3 April 2020
- ↑Sydney's new light rail is now open from Circular Quay to Kingsford Transport for NSW 3 April 2020
- ↑"Final countdown to construction: Sydney Light Rail major works start October 23". Transport for NSW. 28 May 2015.
- ↑"'Moment in history': Commuters board first Parramatta light rail service". ABC News. 19 December 2024. Retrieved 20 December 2024.
- ↑"Parramatta light rail extension to Olympic Park on the Way". Transport for NSW. Retrieved 19 October 2017.
- ↑Busby, Ellie (23 February 2024). "Parramatta Light Rail Stage 2 gets greenlight". parranews.com.au. Retrieved 5 March 2024.
{{cite news}}: CS1 maint: deprecated archival service (link) - ↑O'Sullivan, Matt (25 July 2017). "Why Sydney's new light rail trams won't carry passengers on inner west line". Sydney Morning Herald. Retrieved 6 November 2021.
- 12"NSW government tests new CBD trams on inner west line". Sydney Morning Herald. 9 December 2021.
- ↑"CBD trams tested on Sydney's Inner West light rail to solve shutdown". 9News. 9 December 2021.
- 12"LRV's of the Sydney Light Rail Inner West Extension | www.engineersaustralia.org.au". www.engineersaustralia.org.au. Archived from the original on 28 October 2017. Retrieved 9 February 2018.
- ↑"Contract awarded for delivery of new light rail vehicles". Transport for NSW. Retrieved 16 August 2012.
- ↑O'Rourke, Jim (20 December 2013). "Sneak peek at Sydney's new trams". The Daily Telegraph. Archived from the original on 19 May 2015. Retrieved 20 December 2013.
- 12First new light rail vehicle on the tracks as customer trips pass 1.5 millionArchived 8 August 2014 at the Wayback Machine, Transport for NSW, Retrieved 23 July 2014
- ↑"Six more new light rail vehicles for Sydney". Transport for NSW. Archived from the original on 2 December 2013. Retrieved 11 October 2013.
- ↑"Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation" (Press release). Gladys Berejiklian. 27 March 2015. Archived from the original on 6 April 2015. Retrieved 5 April 2015.
- ↑"Sydney Tram". CAF. Retrieved 1 March 2013.
- ↑"Inner West Light Rail Capacity"(PDF). Sydney Morning Herald. Transport for NSW. Archived from the original(PDF) on 22 January 2021. Retrieved 29 August 2017.
- ↑"Sydney's light rail extension opens"(PDF). Trolley Wire. 55 (2). South Pacific Electric Railway: 22. May 2014. ISSN 0155-1264. Retrieved 12 December 2021.
- ↑"The CAF Group has secured tram supply extension contracts in Belgium and Australia, worth a combined value of nearly 100m euros (119.05m USD), in addition to a new signalling installation contract in Turkey". 30 June 2021. Retrieved 26 July 2021.
- ↑"Inner West light rail services suspended after cracks discovered in trams". SMH. 28 October 2021. Retrieved 5 November 2021.
- ↑"Parramatta Light Rail contracts signed". www.transport.nsw.gov.au. Transport for NSW. 20 December 2018.
- ↑ «El consorcio CAF se asegura el contrato del Tren Ligero de Parramatta en Nueva Gales del Sur (Australia)» . Construcciones y Auxiliares de Ferrocarriles. 20 de diciembre de 2018 . Consultado el 27 de diciembre de 2018 .
- ↑ "Alstom entregará a Sydney el Citadis X05, la última evolución de su gama de tranvías" (Comunicado de prensa). Alstom. Febrero de 2015. Consultado el 25 de febrero de 2015 .
- ↑ "Sídney es el primer cliente del tranvía Citadis X05" . Metro Report International. 25 de febrero de 2015. Consultado el 12 de junio de 2017 .
- ↑ Dean, Emma; Moore, Adam; Bunting, Kathleen ( Parsons Brinckerhoff Australia) (21 de junio de 2013). "CBD y tren ligero del sureste: documento de apoyo para la solicitud de infraestructura de importancia estatal" (PDF) . Transport for NSW . págs. 4, 23. Archivado del original (PDF) el 27 de septiembre de 2013. Recuperado el 12 de julio de 2013 .
{{cite web}}: CS1 maint: varios nombres: lista de autores ( enlace ) - ↑ "CBD y tren ligero del sureste: sesión informativa para la industria" (PDF) . Transport for NSW . 9 de abril de 2013. pág. 11. Consultado el 10 de abril de 2013 .
- ↑ "CBD y tren ligero del sureste: informe de modificación" (PDF) . Transport for NSW. págs. 25, 66. Consultado el 3 de diciembre de 2014 .
- ↑ Alstom completa los primeros vehículos ligeros sobre raíles Citadis X05 para Sydney International Railway Journal , 24 de mayo de 2017
- ↑ Primer tranvía Citadis X05 en circulación. Metro Report International, 24 de mayo de 2017.
- ↑ "Aquí y allá" Trolley Wire número 331 noviembre de 2017 página 12
- ↑ "El tren ligero del Inner West de Sídney vuelve a funcionar a partir de mañana" . www.9news.com.au . Consultado el 13 de febrero de 2022 .
- ↑ "Los servicios de tren ligero regresan al Inner West" . Transport for NSW. 11 de febrero de 2022.
- 1 2 3 4 "Construcción y ampliación del tren ligero de Sídney" . Tecnología ferroviaria.
- ↑ "Detalles técnicos y demás..." (PDF) . Metro Transport Sydney . Archivado del original (PDF) el 15 de febrero de 2012. Consultado el 2 de julio de 2013 .
- ↑ Accidente en el tranvía de New Sydney , número 269, mayo de 1997, página 23
- ↑ Se inaugura la extensión del tren ligero de Sídney. Trolley Wire, número 337, mayo de 2014, página 22.
- ↑ El Sydney Variotram 2107 llega al Museo del Tranvía de Loftus Sydney.
- ↑ Preservation & Tourist Railway Digest Noviembre de 2018, página 52
- ↑ "Sídney arrendará trenes ligeros Velez-Málaga" . International Railway Journal . 13 de mayo de 2013. Consultado el 17 de mayo de 2013 .
- ↑ Walker, Ian (4 de septiembre de 2013). "La entrega de tranvías a primera hora de la mañana paraliza George St" . The Daily Telegraph . Consultado el 4 de septiembre de 2013 .
- ↑ La extensión del tren ligero del Inner West se inaugura la próxima semana. Archivado el 21 de marzo de 2014 en Wayback Machine. Transporte para Nueva Gales del Sur, 21 de marzo de 2014.
- ↑ «Informe anual de Transportes de Nueva Gales del Sur 2013/14» (PDF) . Transportes de Nueva Gales del Sur. 4 de abril de 2014. pág. 45. Archivado del original (PDF) el 5 de diciembre de 2014.
- ↑ "Informe anual de Transporte para Nueva Gales del Sur 2013-14" (PDF) . Transporte para Nueva Gales del Sur. pág. 395. Archivado del original (PDF) el 29 de mayo de 2015. Consultado el 1 de agosto de 2016 .
- ↑ "Informe anual de Transporte para Nueva Gales del Sur 2014-15" (PDF) . Transporte para Nueva Gales del Sur. pág. 131. Consultado el 1 de agosto de 2016 .
- ↑ "Uso del tren ligero" . Rendimiento y análisis del transporte – Transport for NSW. Diciembre de 2016. p. Gráficos de nivel superior . Consultado el 27 de diciembre de 2016 .
- ↑ "Informe anual 2016–17" (PDF) . Transport for NSW. pág. 16. Consultado el 24 de noviembre de 2017 .
- ↑ "Informe anual de Transporte para Nueva Gales del Sur 2017-18" (PDF) . Transporte para Nueva Gales del Sur. pág. 17. Consultado el 2 de diciembre de 2018 .
- 1 2 3 4 "Número de viajes por línea en tren ligero" . Transport for NSW. 8 de julio de 2023. Consultado el 8 de julio de 2023 .
- ↑ "Uso del tren ligero: comparación mensual" . Transport for NSW . Consultado el 15 de julio de 2026 .
- ↑ Consulte Transport for NSW patronage in Sydney by mode para obtener más información.
- ↑"Opal to go live on light rail months ahead of schedule". Transport for NSW. 24 November 2014. Archived from the original on 1 December 2014. Retrieved 24 November 2014.
- ↑http://www.transportnsw.info/sites/en/transport-status/news/2014/opal-rollout.page Opal rollout extends to light rail Archived 6 October 2014 at the Wayback Machine Transport Info NSW 25 November 2014
- ↑"Opal single trip tickets". Transport for NSW. Retrieved 4 August 2019.
- ↑"Opal fares". transportnsw.info. Transport for NSW. Retrieved 22 June 2019.
- ↑"The last paper tickets to be wrapped up on August 1". Transport for NSW. 4 July 2016. Archived from the original on 6 July 2016.
- 12"Sydney's Light Rail Future"(PDF). Transport for NSW. 13 December 2012. p. 20. Archived from the original(PDF) on 9 September 2016. Retrieved 17 March 2017.
- ↑"2014 State Infrastructure Strategy Update"(PDF). Infrastructure NSW. p. 40. Archived from the original(PDF) on 29 November 2014.
- 123"Greater Sydney Services and Infrastructure Plan"(PDF). Transport for NSW. March 2018. pp. 196, 203. Retrieved 19 March 2018.
- ↑"Randwick City Council Governance Advisory Committee Meeting"(PDF).
- ↑Saulwick, Jacob (22 October 2015). "Return of trams to Glebe Island Bridge floated in inner harbour overhaul". The Sydney Morning Herald.
- ↑"Parramatta Light Rail – Stage 1: frequently asked questions"(PDF). Transport for NSW. Archived from the original(PDF) on 17 February 2017. Retrieved 17 February 2017.
- ↑Busby, Ellie (13 June 2024). "Lake's Lidcombe call: Mayor wants Light Rail extended". Parra News. Retrieved 10 July 2024.
- ↑"Extend Parramatta Light Rail Stage 2 to Lidcombe and Strathfield". actionnetwork.org. Retrieved 10 July 2024.
- ↑Minister for Transport; Jo Haylen (19 September 2024). "Construction on Parramatta Light Rail Stage 2 to begin in 2025 as major contract signed". nsw.gov.au (Press release). Transport for NSW. Archived from the original on 14 February 2025. Retrieved 14 February 2025.
- ↑"Light Rail". City of Sydney. Archived from the original on 6 October 2012.
- 12"Green Square light rail moves another step closer". sydneymedia.com.au. City of Sydney. 30 October 2015.
- ↑O'Sullivan, Matt (21 November 2018). "'Transport mess': Passengers at one Sydney station nearly double in three years". The Sydney Morning Herald.
- ↑Saulwick, Jacob (28 July 2015). "Green Square needs light rail, Transport Minister says in break from past". The Sydney Morning Herald. Retrieved 28 July 2015.
- ↑O'Sullivan, Matt (26 June 2024). "Revealed: Plans for new 11km light-rail run on one of Sydney's busiest roads". The Sydney Morning Herald. Retrieved 28 June 2024.
- ↑"Waverley Transport Plan". Waverley Council. December 2011. Archived from the original on 22 February 2014. Retrieved 3 April 2020.
- ↑Paperny, Daniel (11 October 2012). "Light rail on track for Bondi". CityHub Sydney. Retrieved 3 April 2020.
- ↑"URGENT BUSINESS FOR CONSIDERATION"(PDF). Waverley Council. 21 May 2013. Retrieved 3 April 2020.
External links
- Official SiteArchived 3 July 2020 at the Wayback Machine
- Transdev Sydney Official Site
- Information about the extensions
- Ticketing informationArchived 10 September 2015 at the Wayback Machine
- Light rail in Sydney
- Transdev
- 750 V DC railway electrification
- Railway lines opened in 1997
- 1997 establishments in Australia